ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
Qiao Erwei, . 1999: Study on Production Potential Tapping of Waterflooding in the Upper ES~(2+3)Reservoir, South of Pucheng Oilfield. Petroleum Geology and Engineering, 13(04): 23-25+28-29+60.
Citation: Qiao Erwei, . 1999: Study on Production Potential Tapping of Waterflooding in the Upper ES~(2+3)Reservoir, South of Pucheng Oilfield. Petroleum Geology and Engineering, 13(04): 23-25+28-29+60.

Study on Production Potential Tapping of Waterflooding in the Upper ES~(2+3)Reservoir, South of Pucheng Oilfield

  • In the Upper ES2+3 oil Reservoir,south of Pucheng oilfield, oil layers are thick and heterogeneous, sweep efficiency of injection water is low,producing reserves of waterflooding are small,and production decline is sharp.Based on these charaderistics,this paper points out that the directiou of production potential tapping is increasing producing opere of waterfiooding, improving development effectiveness and realizing stable production, and that measures to tap production potential are performing whole tract profile control with PI decision-making technique. Field application of this technique in this reservoir was very successful.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return