ISSN 1673-8217 CN 41-1388/TE
Supervisor:China Petrochemical Corporation Limited Sponsor:Sinopec Henan Oilfield Company
Li Zicheng. 1997: A new Disposal Method of Brine Layer in Drilling. Petroleum Geology and Engineering, 11(06): 32-34+56.
Citation: Li Zicheng. 1997: A new Disposal Method of Brine Layer in Drilling. Petroleum Geology and Engineering, 11(06): 32-34+56.

A new Disposal Method of Brine Layer in Drilling

  • Through the practice of drilling onc well,this paper advances a mew disposal method-- relative pressure stability (underbalance) method for brine layer with high pressure and low permeability in drilling well .Under concerted measures by series, the problem of the brine layer is successfully solved.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return